Site Inspection

6 · Oakland, CA

Saved 05:01 AM
Inspection Record
A · Site Access & Security

Gate and perimeter fencing secure

Padlock / access control functioning

Site signage (ID, emergency contact) present and legible

No signs of unauthorized entry or forced access

Site lighting (if applicable) operational

B · Structure

Structure visibly plumb and free of obvious damage

No visible corrosion, rust, or coating failure

Guy wires / anchors (if applicable) secure and tensioned

No loose or missing bolts / fasteners

No bird nesting or debris accumulation

C · Equipment & Shelter

Shelter / cabinet door seals intact and weatherproof

HVAC operational and free of obstruction

No water intrusion or standing moisture

Batteries / power plant in good condition

No unusual noise, heat, or odor from equipment

Grounding / bonding connections secure

D · Colocation & Third-Party Equipment

Per-tenant: all tenant equipment present and accounted for

Per-tenant: tenant equipment matches lease authorization

Discrepancy sweep: no unauthorized / unidentified equipment

Discrepancy sweep: no abandoned equipment left behind

E · Environmental & Compliance

No hazardous material spills or leaks

Spill kit / containment present where required

No evidence of wildlife or pest intrusion

Permits / licenses posted and current (where required)

No FAA obstruction light failures (if applicable)

G · Structural Loading Flag

Possible structural loading concern — refer to structural engineer

Failed items0
Findings0
Sign-off